Space 11
Water, Air & Sound
Hot water for peak wudu, HVAC for five daily peaks, and a sound system that works.
Key principles · full guide in preparationKey principles
What this room needs.
- Size hot water for the Jumu'ah peak, when most wudu happens in 15 minutes.
- Zone the HVAC: the hall is full five times a day and empty in between.
- Treat hard water at the building entry or on the wudu supply.
- Design the sound system with the acoustics, not after them.
Coming in the full guide
Three material tiers, drawn sections and plans, product examples and a PDF. Same format as the wudu area guide.
Hot water sizingHVAC zoningSound systems
Work with an architect
Planning a new masjid or fixing an old one?
Temelar helps masjid committees plan, design and renovate. Send a few lines about your project. You will get a straight answer on what it takes.