The Masjid ManualMasjid design library by Temelar
Space 11

Water, Air & Sound

Hot water for peak wudu, HVAC for five daily peaks, and a sound system that works.

Key principles · full guide in preparation
Key principles

What this room needs.

  • Size hot water for the Jumu'ah peak, when most wudu happens in 15 minutes.
  • Zone the HVAC: the hall is full five times a day and empty in between.
  • Treat hard water at the building entry or on the wudu supply.
  • Design the sound system with the acoustics, not after them.

Coming in the full guide

Three material tiers, drawn sections and plans, product examples and a PDF. Same format as the wudu area guide.

Hot water sizingHVAC zoningSound systems
Work with an architect

Planning a new masjid or fixing an old one?

Temelar helps masjid committees plan, design and renovate. Send a few lines about your project. You will get a straight answer on what it takes.